Electrabel increases productivity by 10% with Oxand technical audit


Context :
Electrabel needed to improve its management of ageing passive structures (cables, piping) as part of the long-term operation project of the units on two sites. The park wished to extend the operating life of the fifty or so existing buildings (reactor buildings, electrical buildings, storage building, aerosols, galleries, etc.) by a further 10 years.